Relaunch of Halo – 2 Mar 2015

Relaunched Halo with engineer Travis Stoddart, completed sea trials and Nanni engine commissioning, and motored Halo back to berth at Chaffers Marina. 


Other work completed while in dry dock:

  • Removed old (dead) Humminbird chart plotter.
  • Installed new Nanni A4 engine control panel in hole left by Humminbird.
  • Removed old Navman Speed Gauge and thru-hull transducer.
  • Replaced with new Clipper Duet Speed/Log Depth Sounder.
  • Installed new LED cabin lights and light in engine room.
  • Re-wired electrical control panel.
  • Exhaust pipe outlet on stern of boat had to be re-positioned 15cm higher than waterline.

Pending work for completion:

  • Old exhaust hole in stern to be sanded and painted (Kim)
  • Replace exhaust cover (Kim)
  • Welding to repair hairline leak in exhaust pipe (TS)
  • Vacuum and clean engine room and decks (TS)
  • Label electrical switches  (Geoff)
  • Draw new electrical wiring diagram (Geoff)
  • Glue depth sounder transducer to hull (Geoff)
  • Check mast lights working – at night (Geoff)
  • Purchase spares kit.

Noted a small crack in keel. According to Kim it is not serious but should be monitored in case it gets worse:

Comments are closed.

Website Powered by WordPress.com.

Up ↑